Location

  • Financial data center on the outskirts of Zurich
  • 8 km from the banking quarter / downtown Zurich
  • Airport is 30 minutes away by car, train station located nearby
  • Multiple carriers in 2 separate carrier rooms

Building

  • Owned by Green Datacenter AG
  • Building designed and constructed specifically for use as a data center
  • Data center colocation size: 3,200 m2 in the basement
  • Colocation racks, data center cages and data center suites starting at 20 m²
  • Delivery via hydraulic lift and material lock system

Connectivity

  • Carrier-neutral
  • Two independent fiber-optic feeder cables
  • 2 Meet-Me Room concept
  • 2 carrier rooms
  • Fully separated implementation of redundant lines to the rack
  • Access to cloud services 
  • Our 4 data centers are connected by our own redundant fiber-optic ring

Security 

  • Video surveillance
  • 24/365 operation with security staff, technicians and customer contact
  • Separate access points for staff and equipment
  • Secure waiting room for deliveries
  • Access control with a badge and PIN code as well as a man trap system that uses biometric identification
  • Fire extinguishing system

Infrastructure

  • Redundant power supply from two different substations
  • Multiple diesel generators, redundant UPS system, generator operation for up to 72 hours
  • Multiple redundant cooling systems, primary air conditioning via district cooling network
  • Cold aisle principle for maximum energy efficiency (PUE of 1.5)

Certification

  • ISO 27001 information security management system
  • ISO 50001 energy management system
  • ISAE 3402 assurance report (on request)

Optional services

  • Remote Hands 
  • Cross-connects
  • Deployments
  • Reports
  • Cleaning and waste disposal up to and including certified data disposal

      Fact sheet

We're here for you

Would the Zurich City underground financial data center be the perfect place for your IT infrastructure? You're just a few tram stations away from having a professional, tailored data center. We can’t wait to get started!

Write us

   Data center locations

 

   Overview   Zurich North   Zurich West 1+2  Zurich West 3